Our Projects

Barclays

Complete office fit-out and electrical installation for a flagship banking hub at Canary Wharf.

Canary Wharf, London
12 weeks
8,500 sq ft

Plans

Barclays Office Fit-Out
"Professional, reliable and delivered on time. The team understood our requirements from day one and kept disruption to an absolute minimum. We couldn't be happier with the finished space."
James Mitchell
Facilities Manager, Barclays

The Brief

Barclays required a complete transformation of their existing office space at Canary Wharf into a modern, flexible working environment. The brief called for open-plan collaboration areas, private meeting rooms, and a state-of-the-art electrical infrastructure to support their growing technology needs.

The project needed to be completed within a tight 12-week timeframe, with minimal disruption to the adjacent occupied floors. We worked closely with the client's facilities team to coordinate out-of-hours work and ensure business continuity throughout the fit-out.

How We Delivered

The existing space was stripped back to shell and core, with all legacy electrical systems removed and replaced with a new high-efficiency distribution network. We installed over 200 power and data points, along with a comprehensive LED lighting scheme featuring intelligent controls for energy management.

New glazed partitions were installed to create acoustic separation between meeting rooms and open-plan areas, while maintaining natural light flow throughout the floor plate. The project was completed on programme and within budget, with full NICEIC certification and comprehensive O&M documentation.

Project Gallery

Office space overview
Meeting room
Open plan workspace
Collaboration area
Reception area
Break-out space

Key Deliverables

Full Electrical Fit-Out

Complete rewiring with new distribution boards, power outlets and data cabling throughout.

LED Lighting System

Energy-efficient LED lighting with DALI controls and occupancy sensors for smart energy management.

Partitioning & Glazing

Glazed partitions and solid walls to create meeting rooms, focus pods and collaborative spaces.

Fire & Safety Systems

New fire alarm system, emergency lighting and full compliance with building regulations.